02 · ROSTERRest, fatigue and duty limits Your limits, checked as you plan.
ATS.OR.320 names eight elements; you set the values – stricter or more relaxed. We set them up for the whole company.
Compliance matrix
ATS.OR.320(a), point by point.
An air traffic control service provider has to specify these eight elements in its rostering system. Rostify checks all of them — with the limits your organisation sets.
| Ref. | Requirement | Rostify |
|---|---|---|
| (a)(1) | Maximum consecutive working days with dutye.g. 5 day duties in a row · plan | Checked |
| (a)(2) | Maximum hours per duty period | Checked |
| (a)(3) | Maximum time providing air traffic control service without breaks | Checked |
| (a)(4) | The ratio of duty periods to breaks when providing air traffic control service | Checked |
| (a)(5) | Minimum rest periodse.g. 11 h · plan | Checked |
| (a)(6) | Maximum consecutive duty periods encroaching the night time, if applicable, depending upon the operating hours of the air traffic control unit concerned | Checked |
| (a)(7) | Minimum rest period after a duty period encroaching the night time | Checked |
| (a)(8) | Minimum number of rest periods within a roster cyclee.g. 4 weekly rests per month | Checked |
Wording: ATS.OR.320(a)(1)–(8), Regulation (EU) 2017/373, Annex IV. Values: example configuration.
What EUROCONTROL expects from rostering tools beyond this: the 2023 guidelines, point by point
How controller shifts work in practice: patterns, hours and nights
Duty period, rest period, FRMS: the terms in the glossary
Plan and actual
The plan in progress. The published roster.
Compliance is checked meticulously at every action – with separate limits for the roster in planning (plan) and the published roster (actual).
| Example configuration | Plan | Actual |
|---|---|---|
| Max. consecutive day duties | 5 | 7 |
| Min. rest between two duties | 11 h | 10 h8 h with conditions |
| Rest before and after a reduced rest | — | 15 h |
| Weekly rest | 48 h | 36 h |
| Weekly rest periods per month | 4 | 4 |
Set up for you
Stricter than required. Or more relaxed.
Tell us your company’s stricter values and we set them up once, company-wide. Organisations outside the regulation can relax the limits just as easily.
- Relaxed
- ATS.OR.320
- Stricter
91/* ------- REST - FATIGUE ------- */9293$cfgMaxDutiesInRow = 5; // Max. consecutive day duties · PLAN9495$cfgMaxDutiesInRow_vol = 7; // Max. consecutive day duties · ACTUAL9697$cfgMaxPlaceholderRun = 4;9899$cfgMinRest = 11; // Min. rest between two duties · PLAN100101$cfgReducedRest = 10; // Min. rest between two duties · ACTUAL, few conditions102103$cfgMinRest_vol = 8; // Min. rest between two duties · ACTUAL, with conditions104105$cfgExtraRestAroundReduced = 15; // Min. rest before and after a reduced rest106107$cfgMaxHours7d = 60;108109const cfgWeekWarnYellow = 50; // Mark weekly hours in planning above110111const cfgWeekWarnRed = 60; // Max. weekly hours per calendar week112113$cfgWeeklyRestPerMonth = 4; // Weekly rest periods per month114115$cfgMinWeeklyRest = 48; // Weekly rest in hours · PLAN116117$cfgMinWeeklyRest_vol = 36; // Weekly rest in hours · ACTUAL118119/* ----- */120
Where your limits apply
The same limits apply in:
Your limits